Current Status | Withdrawn | Implementation Date | 15/09/2015 |
---|---|---|---|
Version | v1.0 | Related Changes |
Executive Summary
MAP CP 0241 proposes to introduce a system reconciliation exercise into MAP15 between the metering data held in Meter Operator (MOp) systems and ECOES.Change History
27 Aug 2015
MDB (Deferred)