MIF 46 - Notification to ECOES of Change of MAP

Current Status Closed Implementation Date N/A
Version Related Changes

Executive Summary

With the introduction of D0312 validation, the criterion applied to ensure the correct metering information is accepted into ECOES is that the MOP sending the information was the MOP when the meter was installed. An issue has been identified whereby if the MOP is sending a D0312 to advise ECOES of a new MAP, but was not the appointed MOP when the meter was installed, the D0312 will reject. A solution needs to be considered in order that new MAP details can be effectively updated in ECOES without being rejected.

Change History

No changes

Related Documents