June 2019 Release »

June 2019 Release

As of the evening of 27th June 2019  the next release of ECOES will go live with the below changes to the functionality being implemented:

Due to the transfer of metering updates using the D0312 Data Flow from ECOES to MPRS the following activities have been withdrawn.

  • Meter Operator Log in – The D0312 maintenance screen the reports will no longer be accessible.
  • Meter Operator Log in – The D0312 maintenance screen all data management functionality is no longer available, however, a MOp can still view the meter details.
  • Supplier Log in – The D0312 maintenance screen the reports will no longer be accessible.
  • All Log ins – Installing Supplier under the Current Meter Details section will match the information based on the Supplier and Metering history.

Other changes being implemented are :

  • The addition of a Domestic Indicator.
  • The addition of a Metered Indicator.
  • RMP status displays Operational or Terminated.
  • Primary & Secondary Associations (Related MPAN).

The Supplier/Distributor/Meter Operator User Guides are available below: